| Council Name: |
| Contact Person: |
| Phone: Email: |
| Specific Data |
| |
2000/01 |
2001/02 |
2002/03 |
2003/04 |
2004/05 |
2005/06 |
| Total number of building consents issued |
|
|
|
|
|
|
| Total value of building work consented |
|
|
|
|
|
|
| Total revenue from consent fees |
|
|
|
|
|
|
| Total building control costs |
|
|
|
|
|
|
| Building control funding: |
|
|
|
|
|
|
| % User charges |
|
|
|
|
|
|
| % Rates |
|
|
|
|
|
|
| |
| Does Council charge for processing on a per consent basis or per hour basis? |
| Did the basis for charging change in the period 2000/01 to 2006/07? |
| If so, when? |
| Rate per hour (if applicable): |
| Does Council charge for inspections on a per inspection basis, or a per hour basis? |
| Did the basis for charging change in the period 2000/01 to 2006/07? |
| If so, when? |
| Rate per inspection: |
| Rate per hour: |
| Has the number of inspections changed for the building types listed below? |
| |
Number of inspections required - 2001 |
Number of inspections required - 2007 |
| Brick house, slab floor, single storey, trussed roof |
|
|
| Single storey warehouse, slab floor, concrete columns, tilt-up precast walls, steel roof |
|
|
| Single storey retail, two shops, slab floor, driven timber piles, steel columns, tilt-up precast walls, auto doors, steel framed firewall between shops, suspended ceiling |
|
|
| Retirement home, single storey, 12 bdms with washbasins, sep sanitary facs, dining and lounge, commercial kitchens, staff accomm, office, slab floor, timber frame, timber trussed roof, clad in fibrecement with textured coating, prefinished steel roof, plasterboarrd lining |
|
|
| When and why did this change? |
|
|
| Comment |
| Please list and quntify where possible and costs directly attributable to the Building Act 2004 (incuding costs of accreditation). |